|
|
Table of Contents
November 2000
- 1. Overview of the World Commission on Dams Global Case Study Programme
- 2. The Context and Scope of the Case Study on the Tucuruí Hydropower Complex
- 2.1 The Environmental, Social and Economic Context
- 2.2 Purposes and Components of the Tucuruí Hydropower Complex Project
- 3. Predicted and Actual Impacts of the Tucuruí Hydropower Complex
- 3.1 Design of the Project and Implementation Schedule
- 3.2 Financial Costs
- 3.3 Hydropower Generation.
- 3.4 Navigation
- 3.5 Effects on Ecosystems
- 3.6 Social and Economic Effects
- 3.7 Indigenous Societies
- 3.8 Interference with Archaeological Sites
- 3.9 Interactive and Cumulative Effects on the Basin
- 3.10 Regional, National and Global Effects.
- 3.11 Summary of Projected, Observed and Unexpected Impacts
- 4. Distributional Effects of the Tucuruí Hydropower Complex
- 4.1 Preliminary Effects
- 4.2 Actual Effects.
- 4.3 Costs and Benefits Distribution Grid
- 5. Assessment of Options and the Decision-Making Process
- 5.1 Historical Context
- 5.2 Planning and Assessment
- 5.3 Operation and Management
- 6. Criteria and Guidelines: Policy Evolution and Compliance
- 6.1 Juridical and Institutional Framework
- 6.2 The Tucuruí Hydropower Complex in terms of current Environmental Legislation and International Recommendations
- 7. Converging and Diverging Views, and Lessons Learned
- 7.1 Summary of Converging and Diverging Views of the Tucuruí Hydropower Complex
- 7.2 Lessons Learned
- 7.3 Recommendations put forward by Participants in the II Meeting of the Consultative Group
- References
List of Appendices (English)
- Appendix 1: Report on the II Work Meeting of the Consultation Group - Belém, January, 18-19,
- Appendix 2: Report on the Preparatory meeting for the II Work Meeting of the Consultation Group – Tucuruí, January 15–16,
- Appendix 3. WCD Submissions
- Appendix 4: Consultant Contributions
- Appendix 5: Exchange Rates
- Appendix 6: Time Line of Project Planning and Implementation
- Appendix 7: Comments Submitted on Draft Reports
List of Annexes in Portuguese
- Anexo 1 Relatório da 2ª Reunião de Trabalho do Grupo Consultivo
- Anexo 2 Relatório da Reunião Preparatória Para a 2ª Reunião de Trabalho do Grupo Consultivo - Tucuruí, 15 e 16/01/
- Anexo 3 Hidrelétrica de Tucuruí – Processo Decisório
- Anexo 4 Malária e Macrófitas em Tucuruí
- Anexo 5 O Impacto da Hidrelétrica de Tucuruí Sobre os Mamíferos Silvestres
- Anexo 6 Ictiofauna da uhe Tucuruí, Rio Tocantins.
- Anexo 7 Avaliação das Condições da Qualidade da água / Limnologia do Reservatório da Usina Hidrelétrica da uhe Tucuruí - Pa
- Anexo 8 Os Parakanã, Asurini, 'Gavião da Montanha” e a uhe Tucuruí
- Anexo 9 Submissões Para a CMB
- Anexo 10 Linha do Tempo
- Anexo 11 Metodologia e Resultados do Trabalho de Campo dos Estudos Sociais e Econômicos
Copyright © 1998,1999, 2000 The World Commission on Dams
|
|