'Dams and Development' - the Report of the WCD About the WCD Knowledge Base Press Releases, Newsletters, Media Reports, Events
Home Page
Regional Consultations  / Case Studies /  Cross-Check Survey  / Thematic Reviews  / Submissions 
    Brazil Case Study
   Tucuruí Dam and Amazon/Tocantins River Basin
Home  


   Case Studies
Brazil
Norway
Pakistan
Thailand
Turkey
USA
Zambia/
Zimbabwe
  Country Studies:
China
India
Russia
 

Table of Contents
November 2000

  • 1. Overview of the World Commission on Dams Global Case Study Programme
  • 2. The Context and Scope of the Case Study on the Tucuruí Hydropower Complex
    • 2.1 The Environmental, Social and Economic Context
    • 2.2 Purposes and Components of the Tucuruí Hydropower Complex Project
  • 3. Predicted and Actual Impacts of the Tucuruí Hydropower Complex
    • 3.1 Design of the Project and Implementation Schedule
    • 3.2 Financial Costs
    • 3.3 Hydropower Generation.
    • 3.4 Navigation
    • 3.5 Effects on Ecosystems
    • 3.6 Social and Economic Effects
    • 3.7 Indigenous Societies
    • 3.8 Interference with Archaeological Sites
    • 3.9 Interactive and Cumulative Effects on the Basin
    • 3.10 Regional, National and Global Effects.
    • 3.11 Summary of Projected, Observed and Unexpected Impacts
  • 4. Distributional Effects of the Tucuruí Hydropower Complex
    • 4.1 Preliminary Effects
    • 4.2 Actual Effects.
    • 4.3 Costs and Benefits Distribution Grid
  • 5. Assessment of Options and the Decision-Making Process
    • 5.1 Historical Context
    • 5.2 Planning and Assessment
    • 5.3 Operation and Management
  • 6. Criteria and Guidelines: Policy Evolution and Compliance
    • 6.1 Juridical and Institutional Framework
    • 6.2 The Tucuruí Hydropower Complex in terms of current Environmental Legislation and International Recommendations
  • 7. Converging and Diverging Views, and Lessons Learned
    • 7.1 Summary of Converging and Diverging Views of the Tucuruí Hydropower Complex
    • 7.2 Lessons Learned
    • 7.3 Recommendations put forward by Participants in the II Meeting of the Consultative Group
  • References

List of Appendices (English)

  • Appendix 1: Report on the II Work Meeting of the Consultation Group - Belém, January, 18-19,
  • Appendix 2: Report on the Preparatory meeting for the II Work Meeting of the Consultation Group – Tucuruí, January 15–16,
  • Appendix 3. WCD Submissions
  • Appendix 4: Consultant Contributions
  • Appendix 5: Exchange Rates
  • Appendix 6: Time Line of Project Planning and Implementation
  • Appendix 7: Comments Submitted on Draft Reports

List of Annexes in Portuguese

  • Anexo 1 Relatório da 2ª Reunião de Trabalho do Grupo Consultivo
  • Anexo 2 Relatório da Reunião Preparatória Para a 2ª Reunião de Trabalho do Grupo Consultivo - Tucuruí, 15 e 16/01/
  • Anexo 3 Hidrelétrica de Tucuruí – Processo Decisório
  • Anexo 4 Malária e Macrófitas em Tucuruí
  • Anexo 5 O Impacto da Hidrelétrica de Tucuruí Sobre os Mamíferos Silvestres
  • Anexo 6 Ictiofauna da uhe Tucuruí, Rio Tocantins.
  • Anexo 7 Avaliação das Condições da Qualidade da água / Limnologia do Reservatório da Usina Hidrelétrica da uhe Tucuruí - Pa
  • Anexo 8 Os Parakanã, Asurini, 'Gavião da Montanha” e a uhe Tucuruí
  • Anexo 9 Submissões Para a CMB
  • Anexo 10 Linha do Tempo
  • Anexo 11 Metodologia e Resultados do Trabalho de Campo dos Estudos Sociais e Econômicos

Home  /  Search  /  Site Map  /  Contact Us  /  Links

Copyright © 1998,1999, 2000 The World Commission on Dams