Final Paper - Table of Contents
November 2000
- 1. Introduction: Overview of the World Commission on Dams Global Case Study Programme
- 2. The Context and Scope of the Case Study on the Ceyhan Aslantas Project.
- 2.1 Country Context.
- 2.2 The Ceyhan River Basin
- 2.3 The Study Area
- 2.4 Basin Plan from 1966
- 2.5 The Objectives and Components of the Ceyhan Aslantas Project (CAP)
- 3. Projected and Actual Effects of the CAP
- 3.1 Design Characteristics
- 3.2 Time Schedules for Implementation
- 3.3 Financial Costs/Expenditures and Cost Recovery
- 3.3.1 Expenditure
- 3.3.2 Projected and Actual Cost Recovery
- 3.3.3 Share of CAP in Total Investments and GDP
- 3.4 Water Resources
- 3.5 Irrigation and Agriculture
- 3.5.1 Irrigation
- 3.5.2 Agriculture
- 3.6 Hydropower
- 3.6.1 Hydropower Generation from Aslantas HEPP
- 3.6.2 Effects of the Upper Basin Hydroelectric Plants
- 3.6.3 Economic Value of Power Generation
- 3.7 Flood Control
- 3.7.1 Flood Protection and Operation
- 3.7.2 Flood Damage c
- 3.7.2 Safety of the Dam Against the Dam Break Flood
- 3.8 Municipal and Industrial Water Supply
- 3.9 Fisheries
- 3.9.1 Yields, Value and Employment from the River.
- 3.10 Recreation and Tourism
- 3.11 Social Effects
- 3.11.1Settlement.
- 3.11.2 Demographic Effects
- 3.11.3 Displacement and Resettlement
- 3.11.4 Employment.
- 3.11.5 Effects on Social Life
- 3.12 Environmental Effects
- 3.12.1 Description of the Basin Before the Project.
- 3.12.2 Predicted Environmental Impacts.
- 3.12.3 Unpredicted Environmental Impacts of the Dam
- 3.13 Summary of Impacts and Performance.
- 3.13.1 Unexpected Outcomes of CAP
- 4. Interactive, Cumulative and Basin-Wide Impacts
- 5. Distributional Analysis of the CAP
- 5.1 Anticipated Distributional Effects of CAP
- 5.2 The Actual Distributional Effects of the CAP
- 5.2.1 Actual Distributional Effects of CAP in the Project Area.
- 5.2.2 Regional and National Actual Distributional of Effects of CAP.
- 5.2.3 Summary of Findings on Actual Distributional Effects of CAP.
- 6. Options-Assessment and the Decision-Making Process.
- 6.1 Historical Context.
- 6.2 Planning and Appraisal
- 6.3 Detailed Design and Construction
- 6.4 Operations and Monitoring.
- 7. Criteria and Guidelines: Policy Evolution and Compliance.
- 8. Lessons Learned
- 9. Stakeholder Views on Development Effectiveness.
- 9.1 Interview Approach
- 9.2 Interview results.
- 9.3 Summary of Working Group Discussions
- 10. Concluding Remarks.
- References.