Turkey Case Study:
Aslantas Dam / Ceyhan River Basin


   Case Studies
Brazil
Norway
Pakistan
Thailand
Turkey
USA
Zambia/
Zimbabwe
  Country Studies:
China
India
Russia
 

Final Paper - Table of Contents
November 2000

  • 1. Introduction: Overview of the World Commission on Dams Global Case Study Programme
  • 2. The Context and Scope of the Case Study on the Ceyhan Aslantas Project.
    • 2.1 Country Context.
    • 2.2 The Ceyhan River Basin
    • 2.3 The Study Area
    • 2.4 Basin Plan from 1966
    • 2.5 The Objectives and Components of the Ceyhan Aslantas Project (CAP)
  • 3. Projected and Actual Effects of the CAP
    • 3.1 Design Characteristics
    • 3.2 Time Schedules for Implementation
    • 3.3 Financial Costs/Expenditures and Cost Recovery
      • 3.3.1 Expenditure
      • 3.3.2 Projected and Actual Cost Recovery
      • 3.3.3 Share of CAP in Total Investments and GDP
    • 3.4 Water Resources
    • 3.5 Irrigation and Agriculture
      • 3.5.1 Irrigation
      • 3.5.2 Agriculture
    • 3.6 Hydropower
      • 3.6.1 Hydropower Generation from Aslantas HEPP
      • 3.6.2 Effects of the Upper Basin Hydroelectric Plants
      • 3.6.3 Economic Value of Power Generation
    • 3.7 Flood Control
      • 3.7.1 Flood Protection and Operation
      • 3.7.2 Flood Damage c
      • 3.7.2 Safety of the Dam Against the Dam Break Flood
    • 3.8 Municipal and Industrial Water Supply
    • 3.9 Fisheries
      • 3.9.1 Yields, Value and Employment from the River.
    • 3.10 Recreation and Tourism
    • 3.11 Social Effects
      • 3.11.1Settlement.
      • 3.11.2 Demographic Effects
      • 3.11.3 Displacement and Resettlement
      • 3.11.4 Employment.
      • 3.11.5 Effects on Social Life
    • 3.12 Environmental Effects
      • 3.12.1 Description of the Basin Before the Project.
      • 3.12.2 Predicted Environmental Impacts.
      • 3.12.3 Unpredicted Environmental Impacts of the Dam
    • 3.13 Summary of Impacts and Performance.
      • 3.13.1 Unexpected Outcomes of CAP
  • 4. Interactive, Cumulative and Basin-Wide Impacts
  • 5. Distributional Analysis of the CAP
    • 5.1 Anticipated Distributional Effects of CAP
    • 5.2 The Actual Distributional Effects of the CAP
      • 5.2.1 Actual Distributional Effects of CAP in the Project Area.
      • 5.2.2 Regional and National Actual Distributional of Effects of CAP.
      • 5.2.3 Summary of Findings on Actual Distributional Effects of CAP.
  • 6. Options-Assessment and the Decision-Making Process.
    • 6.1 Historical Context.
    • 6.2 Planning and Appraisal
    • 6.3 Detailed Design and Construction
    • 6.4 Operations and Monitoring.
  • 7. Criteria and Guidelines: Policy Evolution and Compliance.
  • 8. Lessons Learned
  • 9. Stakeholder Views on Development Effectiveness.
    • 9.1 Interview Approach
    • 9.2 Interview results.
    • 9.3 Summary of Working Group Discussions
  • 10. Concluding Remarks.
  • References.

Home  /  Search  /  Site Map  /  Contact Us  /  Links

Copyright © 1998,1999, 2000 The World Commission on Dams