|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Pilot Case Study South Africa - Vanderkloof/Gariep Dams, Orange River The South African Case Study was a pilot study conducted and prepared by the WCD Secretariat in 1998 to verify the case study methodology. Please cite this report as follows: World Commission on Dams. Orange River Development Project, South Africa, Case Study prepared as an input to the World Commission on Dams, Cape Town, www.dams.org.
Copyright © 1998-2001 The World Commission on Dams |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||