'Dams and Development' - the Report of the WCD About the WCD Knowledge Base Press Releases, Newsletters, Media Reports, Events
Home Page
Regional Consultations  / Case Studies /  Cross-Check Survey  / Thematic Reviews  / Submissions 
Home  
 


   Case Studies
Brazil
Norway
Pakistan
Thailand
Turkey
USA
Zambia/
Zimbabwe
  Country Studies:
China
India
Russia
 

Final Paper - Table of Contents
November 2000

  • 1.Overview of the World Commission on Dams Global Case Study Programme.
  • 2. The Context and Scope of the Case Study on the Orange River Development Project
    • 2.1 Orange River Basin
    • 2.2 National Context at the Time of Project Planning
    • 2.3 The Objectives and Components of the Orange River Development Project
  • 3.Projected and Actual Impacts of the Orange River Development Project.
    • 3.1 Time Schedules for Implementation
    • 3.2 Design Characteristics
    • 3.3 Financial Expenditure
    • 3.4 Irrigation and Agriculture
      • 3.4.1 Irrigated Area
      • 3.4.2 Cropping Patterns
      • 3.4.3 Gross Value of Agricultural Production
    • 3.5 Municipal and Industrial Water Supply
    • 3.6 Hydropower
      • 3.6.1 Installed Hydropower Capacity
      • 3.6.2 Projected and Actual Hydropower Generation from Gariep and Van der Kloof
      • 3.6.3 Economic Value of Power Generation
    • 3.7 Flood Control
    • 3.8 Recreation and Tourism
    • 3.9 Ecosystem Function and Biodiversity
      • 3.9.1 Description of the Natural River System
      • 3.9.2 Habitats Affected
      • 3.9.3 Mitigation Measures
      • 3.9.4 Atmospheric Impacts
    • 3.10 Regional and National Effects
      • 3.10.1 Predicted Impacts
      • 3.10.2 Actual Regional and National Impacts
    • 3.11 Social Effects
      • 3.11.1 Settlement
      • 3.11.2 Displacement and Resettlement
      • 3.11.3 Employment16
    • 3.12 Interactive, Cumulative and Basin-wide Impacts
    • 3.13 Summary of Impacts and Performance
      • 3.13.1 Predicted versus Actual Outcomes
      • 3.13.2 Unexpected Impacts
      • 3.13.3 Cost Recovery
  • 4. The Distributional Effects of the ORDP.
    • 4.1 Anticipated Distributional Effects of the ORDP
    • 4.2 The Actual Distributional Effects of the ORDP
  • 5. Options-Assessment and the Decision-making Process.
    • 5.1 Historical Context
    • 5.2 Planning and Appraisal
    • 5.3 Detailed Design and Construction
    • 5.4 Operations and Monitoring
  • 6. Criteria and Guidelines: Policy Evolution and Compliance
  • 7. Issues raised and lessons learned for the project and planning cycle
  • 8.Stakeholder Views on Development Effectiveness
    • 8.1 Interview approach
    • 8.2 Interview results
    • 8.3 Comments
  • 9. Bibliography

List of Annexes

  • Annex 1: Purpose of the case study programme
  • Annex 2: Basin Description: Climate, hydrology and geomorphology
  • Annex 3: Conversion rates - Current Rand to 1998 US$
  • Annex 4: Project Costs
  • Annex 5: Predicted area, cropping pattern and gross agriculture value
  • Annex 6: The pre-dam social context: Demographic landscape and control of the land
  • Annex 7: Two contrasting case stories of resettlement
  • Annex 8: Differing perceptions of the effects of resettlement on farm Workers
  • Annex 9. Summary of outcomes of displacement for farmers and workers
  • Annex 10: Definition of the Instream-flow requirement
  • Annex 11: Cumulative environmental impacts within the catchment
  • Annex 12: Institutional arrangements
  • Annex 13. Minutes from the First stakeholder meeting
  • Annex 14. Workshop proceedings and Comments from the final consultation meeting

Home  /  Search  /  Site Map  /  Contact Us  /  Links

Copyright © 1998-2001 The World Commission on Dams