Final Paper - Table of Contents
November 2000
- 1.Overview of the World Commission on Dams Global Case Study Programme.
- 2. The Context and Scope of the Case Study on the Orange River Development Project
- 2.1 Orange River Basin
- 2.2 National Context at the Time of Project Planning
- 2.3 The Objectives and Components of the Orange River Development Project
- 3.Projected and Actual Impacts of the Orange River Development Project.
- 3.1 Time Schedules for Implementation
- 3.2 Design Characteristics
- 3.3 Financial Expenditure
- 3.4 Irrigation and Agriculture
- 3.4.1 Irrigated Area
- 3.4.2 Cropping Patterns
- 3.4.3 Gross Value of Agricultural Production
- 3.5 Municipal and Industrial Water Supply
- 3.6 Hydropower
- 3.6.1 Installed Hydropower Capacity
- 3.6.2 Projected and Actual Hydropower Generation from Gariep and Van der Kloof
- 3.6.3 Economic Value of Power Generation
- 3.7 Flood Control
- 3.8 Recreation and Tourism
- 3.9 Ecosystem Function and Biodiversity
- 3.9.1 Description of the Natural River System
- 3.9.2 Habitats Affected
- 3.9.3 Mitigation Measures
- 3.9.4 Atmospheric Impacts
- 3.10 Regional and National Effects
- 3.10.1 Predicted Impacts
- 3.10.2 Actual Regional and National Impacts
- 3.11 Social Effects
- 3.11.1 Settlement
- 3.11.2 Displacement and Resettlement
- 3.11.3 Employment16
- 3.12 Interactive, Cumulative and Basin-wide Impacts
- 3.13 Summary of Impacts and Performance
- 3.13.1 Predicted versus Actual Outcomes
- 3.13.2 Unexpected Impacts
- 3.13.3 Cost Recovery
- 4. The Distributional Effects of the ORDP.
- 4.1 Anticipated Distributional Effects of the ORDP
- 4.2 The Actual Distributional Effects of the ORDP
- 5. Options-Assessment and the Decision-making Process.
- 5.1 Historical Context
- 5.2 Planning and Appraisal
- 5.3 Detailed Design and Construction
- 5.4 Operations and Monitoring
- 6. Criteria and Guidelines: Policy Evolution and Compliance
- 7. Issues raised and lessons learned for the project and planning cycle
- 8.Stakeholder Views on Development Effectiveness
- 8.1 Interview approach
- 8.2 Interview results
- 8.3 Comments
- 9. Bibliography
List of Annexes
- Annex 1: Purpose of the case study programme
- Annex 2: Basin Description: Climate, hydrology and geomorphology
- Annex 3: Conversion rates - Current Rand to 1998 US$
- Annex 4: Project Costs
- Annex 5: Predicted area, cropping pattern and gross agriculture value
- Annex 6: The pre-dam social context: Demographic landscape and control of the land
- Annex 7: Two contrasting case stories of resettlement
- Annex 8: Differing perceptions of the effects of resettlement on farm Workers
- Annex 9. Summary of outcomes of displacement for farmers and workers
- Annex 10: Definition of the Instream-flow requirement
- Annex 11: Cumulative environmental impacts within the catchment
- Annex 12: Institutional arrangements
- Annex 13. Minutes from the First stakeholder meeting
- Annex 14. Workshop proceedings and Comments from the final consultation meeting