|
|
|
Final Paper - Table of Contents
November 2000
-
- 1. Introduction
- 2. Objectives and Scope
- 2.1 Objectives
- 2.2 Scope
- 2.3 Limitations of the Survey
- 3. Sampling Technique and Survey Methodology
- 3.1 Adopted Sampling Technique
- 3.2 Criteria and Methodology for Selection of the Target Sample
- 3.3 Composition of the Survey Sample
- 4. Survey Strategy and Process
- 4.1 Questionnaire Design and Pilot Study
- 4.2 Data Collection Procedure
- 4.3 Contributors to the Survey
- 4.4 Quality of Submissions
- 4.5 Data Enhancement and Adopted 'Safety Nets'
- 5. Derivation of Indicators and Analytical Approach
- 5.1 Indicator Overview
- 5.2 Analytical Overview
- 6. Findings: Emerging Patterns and Trends of the Survey
- 6.1 Part I: Performance Aspects of Large Dams
- 6.2 Part II: Social and Environmental Impacts
- 6.3 Part III: Decision-Making (DM) Aspects
- 7. Conclusions and Lessons Learned
- 7.1 Key Findings
- 7.2 Key Lessons Learned from the Cross-Check Survey
- 8. Implications of the Survey and Recommendations for Further Studies
- References
- Glossary of Terms and Definitions
- Annex 1: Final List of Cross-Check Survey Dams
- Annex 2: List of Contributors
- Annex 3: Main Survey Questionnaire
- Annex 4: Supplementary Survey Questionnaire
- Annex 5: Questionnaire External Review Summary Report
- Annex 6: Final List of 32 Indicators used for Analysis
- Annex 7: List of Survey Cross-Classifications
- Annex 8: A Guide to Types of Graphics & Statistics Used
- Annex 9: Key Regional Findings of the Cross-Check Survey
- Annex 10: Detailed Findings of Cross-Classifications for all 32 Cross-Check Indicators
- Annex 11: Review Comments received for Draft Report
Copyright © 1998-2001 The World Commission on Dams
|
|