Dear Contributor
Some of our commissioners and crosscheck contributors have recommended a few additional questions relating to dam projects that would add value to the findings of this survey. the wcd has endorsed their requests by adding these additional questions.
These questions will supplement the main questionnaire which you have or are currently completing.
The questions are fairly general in nature to minimise revisits to project archives or additional time and resource demands.
Please fill in and return this supplementary questionnaire to
the wcd by not later than 29 february 2000.
Our fax no is: +27 21 426
0036
Your co-operation in this regard is be sincerely appreciated.
General Data
| 1. | Where
on the river is the dam project located? Please tick the appropriate box. |
Upper reaches | |||||
| Middle reaches | |||||||
| Lower reaches | |||||||
| 2. | Distance from the sea [kilometers] | ||||||
| 3. | Elevation of river bed (at dam) from mean sea level [meters] | ||||||
| 4. | Is this dam project situated on a major river or tributary river | Major | Tributary | ||||
| 5. | Fill in the number of dams up and downstream of the project | Upstream |
Downstream |
||||
| 5.1 | No. of large dams (greater than 15m height) on the major river | ||||||
| 5.2 | No. of other dams (less than 15m height) on the major river | ||||||
| 5.3 | No. of large dams (greater than 15m height) on the tributaries | ||||||
| 5.4 | No of other dams (less than 15m height) on the tributaries | ||||||
| 6. | Year of detailed project report on which decision was made to construct project | ||||||
Daily |
Seasonal |
||||||
| 7. | Reservoir storage - maximum draw down of storage (meters) | ||||||
| 8. | Sedimentation | Expected |
Actual |
||||
| 8.1 | Sedimentation inflow to reservoir [tons/yr] | ||||||
| 8.2 | Life span of reservoir active storage [yrs] | ||||||
IRRIGATION DATA (applicable to irrigation dams
only)
9 In the irrigation category of the main questionnaire provided to you for the crosscheck survey, please include the following additional information: Cost Data
10 Project Funded by: Electrical / Mechanical infrastructure [%] Civil works [%] Irrigation / water supply infrastructure [%] was (US$) ---------------------------------------------------------- in year------------ by ------------------------------- (name of the body conducting economic and / or
financial appraisal). Technical Data FINAL QUALITATIVE OVERVIEW
Fill in the % of Total Project Cost
Financing agencies
Name
Utility /
Agency
Regional /
local govt
National
govt
Bilateral
agency
Multilateral
agency
Private Investors
- national
-
international
Other
Total % for each category:
12 Any events of seismic
tremors / quakes / increase activity know prior to or after the filling of the reservoir?
Give us details (based on public information or specific data)
1.
2.
3.